Geology & Hydrogeology Projects

    The purpose of the hydrogeological /geophysical survey (as required by the Water Resources Management Authority) is to explore the possibility of identifying a groundwater source for any Water Supply Project. The studies aim at evaluating the groundwater situation as it is, through collecting any available relevant data (e.g. drilling logs), evaluating data from the surrounding boreholes, carrying out field geophysical measurements and reviewing any available previous survey report to form the hydrogeological geophysical survey report which will be in accordance with the clients preferences and the new regulations from the Water Resources Management Authority.
     

    It is also worth to note that unlike in the past, it is now required by the National Environment Management Authority (NEMA) to conduct an Environmental Impact Assessment for any borehole drilling project. The consultant has therefore covered this aspect in details below, together with other other consultancy services pertaining to the later drilling stage such as drilling supervision works.

    Anacon undertakes Environmental Impact Assessment report preparation alongwith Hydrogeological studies of specific site.

    Sr. No

    Project Proponent

    Project Details & Plant Cap.

    Report Presentation

    Period

    1

    Lafarge India Ltd., Raipur, C.G.

    Identification of route cause for river bed drying in summer

    After identifying the causes, suggested four alternatives with costing for implementation

    Jan – Jun 2003

    2

    Europratik Ispat Ltd., Raipur, C.G.

    Hydrogeological survey 50 Acre

    ALow cost water reservoir suggested

    Apr-03

    3

    Kinetic Motors Ltd.,Pithampur, M.P.

    Hydrogeological survey in 50 Acre

    With respect to construction of hazardous waste disposal using DRASTIC model

    Mar-05

    4

    Force Motors Ltd., (Bajaj Tempo Ltd.,) Pithampur M.P.

    Hydrogeological survey in 70 Acre

    With respect to construction of haz waste disposal using DRASTIC model

    Apr-05

    5

    Ultra Tech Cement Ltd.,Chandrapur. Maharashtra

    3 km2 river bed survey for water availability in lean season

    Proposed jack well location suggested with crises mgmt. plan for water availability

    May-05

    6

    API – Ispat & Power Tech. Raipur. C.G.

    Hydrogeological survey 65 Acre

    Findings of the report avoided shifting of the project site

    May-05

    7

    Gupta Coal Washery, Jharsuguda, Orissa.

    Hydrogeological survey in 50 Acre

    With respect to construction of hazardous waste disposal using DRASTIC model

    Jun-05

    8

    Pratibha Syntex Ltd., Pithampur, M.P.

    Hydrological Survey in 75 Acre

    With respect to construction of hazardous waste disposal using DRASTIC model

    Feb. 2006

    9

    Nakoda Ispat Ltd., Siltara, Raipur C.G.

    Hydrogeological Survey 25 Acres

    To know ground water availability

    Mar-06

    10

    Prakash Industries Ltd. Raipur, C.G.

    Rod mill and tube mill

    Rainwater harvesting in 32 acre area

    Apr-06

    11

    Lafarge Arasmeta Captive Power Co. Pvt. Ltd., Bilaspur, C.G.

    50 MW Thermal Power plant

    Study of watershed development in 314 km2 using Remote sensing satellite imagery

    Jan – Jun 2006

    12

    Lafarge Arasmeta Captive Power Co. Pvt. Ltd., Bilaspur, C.G.

    50 MW Thermal Power plant

    Rain water harvesting in plant

    Jun-06

    13

    TATA Steel Ltd., Jamshedpur, C.G.

    River hydrology study for Indravati river

    To assess impact/s of flood over the proposed steel plant and township

    Jan. – Jun 2006

    14

    TATA Steel Ltd., Jamshedpur, C.G.

    Geological Study 314 km2 area

    To assess availability, quality & quantity of economical extractable minerals.

    Jan. – Jun 2006

    15

    TATA Steel Ltd., Jamshedpur, C. G.

    Hydrogeological Survey 314 km2 area

    To assess the ground water regime within the study area.

    Jan. – Jun 2006

    16

    Comprehensive hydrogeological survey, Korba, CG

    STCLI Coal Washery and 2 X 25 MW Power plant

    To assess the ground water regime within the study area.

    Jan. – Jun 2007

    17

    Rasoya Proteins Ltd., Vani, Maharashtra

    Hydrogeological Survey at Wani site 14 acres.

    To assess the ground water regime within the study area.

    May-07

    18

    Toyo Engg. Pvt.Ltd. Mumbai

    Hydrogeological Survey in 14 acres at Dharikheda site

    To assess the ground water regime within the study area.

    Nov. 2008

    19

    M/s Riverstone Ltd.

    Recuperation tests

    To assess the ground water regime within the study area.

    May-08